This project at Mercyhurst University in Erie, Pennsylvania called for a complete rebuild of the facility's ice-making infrastructure from the ground up. We removed the existing chiller, dehumidification system, and ice rink floor, clearing the way for a fully modernized setup.

We installed a new 125-ton R-507 chiller, an 8,000 CFM dehumidification system, and a new ice rink floor engineered so the dasher boards could be mounted directly on the cold floor slab — a precision design detail that improves durability and performance. The result is a turnkey, dependable system built for long-term reliability.