This project at the Knoxville Civic Auditorium and Coliseum in Knoxville, Tennessee involved the removal and replacement of the facility's existing concrete cold floor and subfloor piping.

We installed a new subfloor heating system along with a 6¾" concrete cold floor, delivering a precision-built, dependable playing surface engineered for long-term performance.

Previous
Previous

Bill Gray's Ice Plex - Rochester, NY