This project at Wings Event Center in Kalamazoo, Michigan involved the full demolition and removal of the existing ice rink chiller and floor, clearing the way for a complete refrigeration upgrade.
We installed a new concrete floor along with a custom-engineered 250-ton R-407a chiller package, including heat reclaim and a snow melt pit — a dual-purpose design that puts the system's waste heat to practical use. The result is an energy-efficient, high-performance system built for long-term reliability.